Richmond Heights Upper School is a new two story facility for grades 6-12 for 540 students. The new building was constructed on the existing high school parking lot. The existing high school gymnasium had to be torn down at the start of the project to make room for the new Upper School. The existing high school remained in operation during the construction. The existing high school was torn down and a new parking lot was constructed after the high school demolition is completed.
Then Design Architecture